Skip to content
Engineers LLP

Cold chain · CA stores

Controlled atmosphere stores to 5,000 MT, built to hold gas.

9 CA stores built from Pulwama to Thane, 2 more renovated, expanded, under construction or maintained, and the operation of a 12,000 MT CA facility at Rai.

9
CA stores built
5,000
MT, largest built

Lassipora and Thane

1,25,000
sq ft, largest by area

CONCOR, Rai

12,000
MT, facility under O&M

FHEL, Rai

A controlled atmosphere store keeps fruit at low temperature with oxygen held at 1 to 3 per cent and carbon dioxide at 1 to 5 per cent, for months. The refrigeration plant, nitrogen generator and CO2 scrubber set the atmosphere; the building keeps it. A chamber that leaks costs energy every hour it runs and shortens the storage life of everything inside it.

What we have built

Two 5,000 MT stores: for Valley Fresh at SIDCO Industrial Area, Lassipora, Pulwama, and for Suroop Fresh at village Lahe, Shahapur, Thane. Both were delivered as civil, insulation, electrical and refrigeration on one contract. At Lassipora the firm also built a 60,000 sq ft CA store with packing and grading building for Fruit Master Agro. At SIDCO Electronics Complex, Rangreth, Srinagar, a 65,000 sq ft CA store and pack house with external development for FIL Industries. And at HSIIDC Rai, Sonipat, the 1,25,000 sq ft CA store with grading and packing hall for CONCOR, the largest cold chain build in the portfolio by area. At Bathinda, a CA store for Malwa Fresh Food.

Under construction: a pack house with sorting and grading unit and CA storage infrastructure for the State Agriculture Marketing Board, Uttarakhand, at Arakot, Uttarkashi. Renovated or expanded: HPMC's CA stores at Jarol Tikkar and Gumma, and the post-harvest infrastructure at Rohru. Maintained: FHEL's 12,000 MT facility at Rai and HPMC's stores at four locations.

What decides whether it works

Gas-tightness. India's NHB and NCCD standards reference ISO 6949:1988(E) Type-2 for CA chambers. Whether a chamber meets it is decided by panel joints, the continuity of the vapour barrier, the door gaskets and every cable and pipe penetration, all of which are the builder's work. Why gas-tightness is a civil problem explains what to specify.

Chamber sizing and utilisation

NHB norms permit chambers from 50 to 250 MT, and the chamber plan decides how the store earns. Smaller chambers let a promoter open one at a time as fruit comes in, hold different lots at different regimes, and let space by the chamber to FPOs and traders. A 5,000 MT store planned as one large volume is cheaper to build and harder to keep full. We work the chamber plan with the promoter before the structural design starts.

Projects

11 CA store engagements.

Built stores first, then renovation, expansion, construction in progress and O&M.

Cold chain

125,000 sq ft CA storage and grading facility

CONCOR / FHEL

HSIIDC Rai, Haryana

1,25,000 sq ft

125,000 sq ft CA storage with grading, packing and external development work.

Civil · Insulation · Electrical · Refrigeration · External development

Cold chain

5,000 MT CA store

Suroop Fresh

Village Lahe, Maharashtra

5,000 MT

5,000 MT controlled atmosphere store.

Civil · Insulation · Electrical · Refrigeration

Cold chain

5,000 MT CA store

Valley Fresh

SIDCO Lassipora, Jammu and Kashmir

5,000 MT

5,000 MT controlled atmosphere store at SIDCO Industrial Area.

Civil · Insulation · Electrical · Refrigeration

Cold chain

CA store and pack house

FIL Industries

SIDCO Electronics Complex, Jammu and Kashmir

65,000 sq ft

65,000 sq ft CA store, pack house and external development work.

Civil · Insulation · Electrical · Refrigeration · External development

Cold chain

CA store and packing/grading building

Fruit Master Agro

Lassipora, Jammu and Kashmir

60,000 sq ft

60,000 sq ft CA store with packing and grading building.

Civil · Insulation · Electrical · Refrigeration

Cold chain

CA storage

Malwa Fresh Food

Bathinda, Punjab

CA store · Warehouse

Construction of controlled atmosphere storage.

Civil

Cold chainOngoing

Pack house and CA storage, Arakot

State Agriculture Marketing Board, Uttarakhand

Arakot, Uttarakhand

Pack house · CA store

Supply, installation, testing and commissioning of a pack house consisting of a sorting and grading unit and CA storage infrastructure.

Civil · Machinery supply & installation

Cold chain

Post-harvest infrastructure upgradation

HPMC

Rohru, Himachal Pradesh

CA store · Upgradation · Expansion

Civil work for upgradation, expansion and strengthening of existing post-harvest infrastructure.

Civil

Cold chain

12,000 MT agri logistics centre — O&M

CONCOR / FHEL

Rai, Haryana

12,000 MT

Operation and maintenance of a 12,000 MT agri logistics centre covering controlled atmosphere systems, AHUs, cooling towers, water softening plants, bore wells, refrigeration racks, chiller plants and control panels, refrigeration and air-conditioning, nitrogen plant, CO2 scrubbers, CA chamber doors and fans, electrical systems (DG sets, transformers, HT/LT panels, motors, pumps, servo stabilisers), ETP plant, fire and alarm systems, the sorting, grading and packing line with control panels, Carel temperature monitoring, weighing machines, dock levellers and pump room.

Operation & maintenance

Cold chain

CA cold store AMCs, four sites

HPMC

Gumma, Himachal Pradesh

CA store · O&M / AMC

Annual maintenance contracts for the corporation's controlled atmosphere cold stores at four locations.

Operation & maintenance

Questions

Asked at the first meeting.

On turnkey contracts, yes: the two 5,000 MT stores and the CONCOR, FIL and Fruit Master stores carried civil, insulation, electrical and refrigeration together. We also maintain the nitrogen plant, scrubbers and refrigeration at the 12,000 MT FHEL facility.

Either can carry the insulated envelope. The choice follows span, height, ground and programme, the same as any industrial building; RCC or PEB? sets out the trade-offs. What matters more is that the envelope, penetrations and floor insulation are detailed and built by one team.

Capacity in MT, what will be stored, the district, whether the land is in your possession, what drawings exist and when you want to commission. Funding readiness helps us pace the work. The cold chain enquiry form asks exactly these questions, in that order.

Planning a CA store?

Tell us the capacity in MT and the district. An engineer reviews the site and comes back with a chamber plan and an indicative cost band.

We guarantee 100% privacy. Your project details go only to our engineering team and will not be shared with any third party.