Skip to content
Engineers LLP

What we build · Infrastructure & external development

Roads, drains, boundary walls and bulk services.

5 stand-alone infrastructure contracts, and external development in the scope of 12 projects across the portfolio, from OEM plants to a 65-acre farm house development.

5
Infrastructure contracts
12
Projects with external development in scope
5,500
m of boundary wall on pile foundation

Hero MotoCorp, Halol

1,000
acre SSB campus, external development

NBCC, Maujpur, per the company profile

For NBCC, the external development works and bulk services for the residential and non-residential buildings, battalion and sector headquarters of the Sashastra Seema Bal at Maujpur, Laxmangarh, Alwar: civil, external development, PHE and electrical. The company profile records the campus at 1,000 acres.

For Hero MotoCorp, a 5,500 m boundary wall on pile foundation at Halol, Vadodara; the external drainage system at the Tirupati plant; and drainage and waterproofing at the CIT at Kukas. For JTEKT India, the boundary wall and allied work at Jalisana, Mehsana.

External development inside other contracts

External development appears in 12 projects across the portfolio: the roads, drains, STP and ETP at the Agro Allied complex at Keshwana; the roads, boundary and underground water tanks of a 65-acre farm house development for Interact Consultant; the yards and roads at the SIYAT, TCI Tajnagar and OM Logistics Sisana warehouses; and the site works at the CONCOR Rai and FIL Industries cold chain projects.

How we size the enquiry

Site area, the length and specification of boundary wall, road lengths and widths, drainage catchment, and whether bulk water, sewage and power distribution are in scope. Piling is priced separately once the ground is known.

Projects

5 infrastructure contracts.

Projects where infrastructure was the whole contract. External development within building contracts is shown on those projects.

Infrastructure

5,500 m boundary wall

Hero MotoCorp

Halol, Gujarat

Boundary wall

5,500 m long boundary wall on pile foundation.

Civil

Infrastructure

Boundary wall, Jalisana

JTEKT India

Jalisana, Gujarat

Boundary wall

Boundary wall construction and allied work.

Civil

Infrastructure

Drainage and waterproofing, CIT

Hero MotoCorp

Kukas, Rajasthan

External development

Miscellaneous civil work for drainage and waterproofing at CIT.

Civil

Infrastructure

External drainage system

Hero MotoCorp

Tirupati, Andhra Pradesh

External development

Civil work for the external drainage system.

Civil

Infrastructure

SSB campus external development

NBCC (India)

Maujpur, Rajasthan

External development

External development works and bulk services for residential and non-residential buildings, battalion and sector HQ for SSB. Photo caption states 1,000 acres.

Civil · External development · PHE · Electrical

Planning site works?

Send us the site plan and the specification. Boundary wall, roads, drains and bulk services priced as one scope or as part of a building contract.

We guarantee 100% privacy. Your project details go only to our engineering team and will not be shared with any third party.